Objectives
- The 9 key Elements of Successful Plant Commissioning.
- Startup Sequence and General Commissioning Procedures
- How to Operate the major plant equipment’s efficiently and Shutdown safely.
- How to Do Troubleshooting for the major plant equipment’s.
- How to manage risks, health, safety and environment issues in Plant Operation and Shutdown environment.
- Recognize the Human Factors affecting the Operation, Start-up and Shutdown of the process plant.
- Familiar with the Troubleshooting Techniques for the Process Plant Equipment’s
Outline
The 9 key Elements of Successful Plant Commissioning;
- Planning.
- Mechanical Completion.
- P&ID Checking
- Pre-Commissioning
- Commissioning
- Start-up
- Initial Operation
- Performance Testing
- Post-Commissioning
Startup Sequence and General Commissioning Procedures
- Operational checkout list.
- Hydrostatic testing.
- Final inspection of vessels.
- Flushing of lines.
- Instruments.
- Acid cleaning of compressor lines.
- Breaking in pumps.
- Breaking in compressors.
- Dry-out and boil-out.
- Catalyst loading.
- Tightness test Work
- Plant units commissioning
Pumps;
- Operations.
- Start-up and Shutdown.
- Troubleshooting.
- Case Studies
- Cooling Water.
- Fire Water.
- Boiler feed water.
- Waste water; API units.
Compressors;
- Operations.
- Start-up and Shutdown.
- Troubleshooting.
- Case Studies;
- Instrument air compressors.
- Gas compressors.
Steam Boilers;
- ASME Guidelines for Water Quality and ABMA for Steam Purity
- Operations.
- Start-up and Shutdown.
- Troubleshooting.
- Case Studies;
- BFW – Problems and Solutions Cooling Water.
- Steam systems; Snuffing Steam.
Fractionation and distillation;
- Operations.
- Start-up and Shutdown.
- Troubleshooting.
- Case Studies;
- De-ethanizer.
Heat Exchangers;
- Operations.
- Start-up and Shutdown.
- Troubleshooting.
- Case Studies;
- The factors affecting the design of Heat Exchangers.
Fired Equipment’s – Furnace / Heaters;
- Operations.
- Start-up and Shutdown.
- Troubleshooting
- Case Studies
- Drying out importance.
Reactors
- Operations.
- Start-up and Shutdown.
- Troubleshooting.
- Case Studies
- Catalyst loading / unloading.
- Catalysts Deactivation
Separators;
- Operations.
- Start-up and Shutdown.
- Troubleshooting.
- Case Studies;
- Horizontal / Vertical Types.
Relief Systems;
- Operations.
- Start-up and Shutdown.
- Troubleshooting.
- Case Studies; High Flare Tips change out.
Human Factors;
- The Human Factors Analysis and Classification System (HFACS)
- The HFACS taxonomy (Four Level)
- HFACS Level 1: Unsafe Acts
- HFACS Level 2: Preconditions for Unsafe Acts
- HFACS Level 3: Unsafe Supervision
- HFACS Level 4: Organizational Influences
- Training and Performance
- Incident Investigation
- Audits and Corrective Action
Who Should Attend ?
Operations, maintenance staff, peoples who are working with the day to day plant activities.