The Principles and Techniques of Process Operation, Start Up, Shutdown and Troubleshooting

202412aug(aug 12)12:23 am16(aug 16)12:23 amThe Principles and Techniques of Process Operation, Start Up, Shutdown and Troubleshooting

Course Details

Objectives

  • The 9 key Elements of Successful Plant Commissioning.
  • Startup Sequence and General Commissioning Procedures
  • How to Operate the major plant equipment’s efficiently and Shutdown safely.
  • How to Do Troubleshooting for the major plant equipment’s.
  • How to manage risks, health, safety and environment issues in Plant Operation and Shutdown environment.
  • Recognize the Human Factors affecting the Operation, Start-up and Shutdown of the process plant.
  • Familiar with the Troubleshooting Techniques for the Process Plant Equipment’s 

Outline

The 9 key Elements of Successful Plant Commissioning;

  • Planning.
  • Mechanical Completion.
  • P&ID Checking
  • Pre-Commissioning
  • Commissioning
  • Start-up
  • Initial Operation
  • Performance Testing
  • Post-Commissioning

Startup Sequence and General Commissioning Procedures

  • Operational checkout list.                  
  • Hydrostatic testing.
  • Final inspection of vessels.
  • Flushing of lines.
  • Instruments.   
  • Acid cleaning of compressor lines.
  • Breaking in pumps.                
  • Breaking in compressors.
  • Dry-out and boil-out.             
  • Catalyst loading.
  • Tightness test Work
  • Plant units commissioning

Pumps;

  • Operations.
  • Start-up and Shutdown.
  • Troubleshooting.
  • Case Studies
  • Cooling Water.
  • Fire Water.
  • Boiler feed water.
  • Waste water; API units.

Compressors;

  • Operations.
  • Start-up and Shutdown.
  • Troubleshooting.
  • Case Studies;
  • Instrument air compressors.
  • Gas compressors.

Steam Boilers;

  • ASME Guidelines for Water Quality and ABMA for Steam Purity
  • Operations.
  • Start-up and Shutdown.
  • Troubleshooting.
  • Case Studies;
  • BFW – Problems and Solutions Cooling Water.
  • Steam systems; Snuffing Steam.

Fractionation and distillation;

  • Operations.
  • Start-up and Shutdown.
  • Troubleshooting.
  • Case Studies;
  • De-ethanizer.

Heat Exchangers;

  • Operations.
  • Start-up and Shutdown.
  • Troubleshooting.
  • Case Studies;
  • The factors affecting the design of Heat Exchangers.

Fired Equipment’s – Furnace / Heaters;

  • Operations.
  • Start-up and Shutdown.
  • Troubleshooting
  • Case Studies
  • Drying out importance.

Reactors

  • Operations.
  • Start-up and Shutdown.
  • Troubleshooting.
  • Case Studies
  • Catalyst loading / unloading.
  • Catalysts Deactivation

Separators;

  • Operations.
  • Start-up and Shutdown.
  • Troubleshooting.
  • Case Studies;
  • Horizontal / Vertical Types.

Relief Systems;

  • Operations.
  • Start-up and Shutdown.  
  • Troubleshooting.
  • Case Studies; High Flare Tips change out.

Human Factors;

  • The Human Factors Analysis and Classification System (HFACS)
  • The HFACS taxonomy (Four Level)
  • HFACS Level 1: Unsafe Acts

    • HFACS Level 2: Preconditions for Unsafe Acts
    • HFACS Level 3: Unsafe Supervision
    • HFACS Level 4: Organizational Influences

  • Training and Performance
  • Incident Investigation
  • Audits and Corrective Action

Who Should Attend ?

Operations, maintenance staff, peoples who are working with the day to day plant activities.

Date

12 (Monday) 12:23 am - 16 (Friday) 12:23 am(GMT+03:00)

Venue

London

Other Events

Register

Health Guidelines for this Event

Masks Required
Physical Distance Maintained
Event Area Sanitized
TOP
Don`t copy text!